EnglishEnglish
BN LN002340 CX130 excavator swing reduction gearbox
You are here: Home » Products » Swing Reduction Gearbox » Apply to CASE Excavators » BN LN002340 CX130 excavator swing reduction gearbox

PRODUCT SEARCH

PRODUCT CATEGORY

PRODUCT CATEGORY

CONTACT US
CONTACT US

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

BN LN002340 CX130 excavator swing reduction gearbox

BN gears have wide range models of evaporator swing drive, swing gearbox, swing reduction gear. Click here to learn more.
Availability:
Product Description

BN LN002340 CX130 excavator swing reduction gearbox  


BN LN002340 CX130 excavator swing reduction gearbox

Continued hot CX130 excavator swing reduction gearbox


Product Description

BN LN002340 CX130 excavator swing reduction gearbox  


PART NAME SWING REDUCTION UNIT
EQUIPMENT CX130 Crawler Excavator
PART No. LN002340
SERIAL No. -
STOCK CODE 9202913
HOLDER HOLES 9/1
CATEGORY Construction Machinery Parts, Excavator Hydraulic Parts
INSTALLATION SITE Gear Assy Reduction
APPLICATION Replacement
ITEM CONDITION NEW
LOGO BN

MOQ

1 pc



DESCRIPTION:

1. Completely, assembly, and ready to installed in your E307B excavators.  

2. Without MOTOR and SWING CIRCEL.  

3. All components are produced by us.

4. All new, undamaged.

5. Painted or Unpainted, depend on requirement

6. 90 days warranty, call or email with any questions.

7. Plywood Case Packing, free of fumigation

8. Deliver to worldwide by Sea, Air, or Carrier.


BN LN002340 CX130 excavator swing reduction gearbox



BN LN002340 CX130 excavator swing reduction gearbox


Company Information

BN LN002340 CX130 excavator swing reduction gearbox  

BN LN002340 CX130 excavator swing reduction gearbox


Our Services

BN LN002340 CX130 excavator swing reduction gearbox  

  1. We are the manufacturer and own 18000 m2 factory areas, good relationship with material suppliers, which make more competitive price and steady quality.

  2. We have more than 80 units advanced facilities for production.

  3. We have 8 senior engineers with more than 30 years experience on designing and machining.

  4. Our sales term offer the efficient service for every customers.

  5. We are the long term parts supplier for many famous companies, such as FOSTER WHEELER POWER MACHINERY CO.,LTD and C.R.Dinly etc.

  6. We develop spare parts for old and new excavator models, and submit our latest products to customers every month so that to meet the market demand.

  7. We have high market share in Oversea market and Domestic market, Southeast Asia 65%, Middle East 8%, North and South America 10%,Europe 8%, Russia 5%.

BN LN002340 CX130 excavator swing reduction gearbox



BN LN002340 CX130 excavator swing reduction gearbox  
1. Warranty Type:

We will replace the product which have quality problem.
2. Warranty Period:
Supply 3 months warranty for the products from the date of arrival. Customer should check the items according to the order list after arrival. Contact with us and offer the data, photos of the problem items.
3. You need to pay for the replacement charge for following condition:
* Wrong Order from customer.
* Natural Disasters cause the damage.
* Error installation.
* The machine and reducer work over time and over load.
* Lost by any condition.
* Human element destroyed.
* Corrode with rust during stock and running.
* Warranty Expired.
4. Others
They are the product easy to be rust away, please wrap them well. We just supply warranty for the products we are producing, except the Bearing, Seal, and some others we mention before order.If there is any problem about the products, installation or maintenance, please contact with us any time. We reserve the rights of final interpretation.




Packaging & Shipping


BN LN002340 CX130 excavator swing reduction gearbox


TRADE TERMS

EXW, FOB, CFR, CIF

PAYMENT TERMS

T/T, Western Union, Escrow

PORT

Jiangmen Port, negotiation

LEAD TIME

  1. Stock in hand: 4-7 days for processing and packing

  2. Bulk Production: 10-35 days, depend on the quantity.

DELIVERY

By Sea, Air, Carrier

ORDER FLOW

  1. Customers offer the part number, part name, model, quantity, data of items, delivery term.

  2. We quote the best price according to the requirement of customers.

  3. Confirm the purchase order and pay the deposit.

  4. We prepare and pack the goods.

  5. Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.

  6. We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.

  7. Track the transport and arrival about the goods.

  8. Welcome to give us suggestion and feedback once arrival.

BN LN002340 CX130 excavator swing reduction gearbox


BN LN002340 CX130 excavator swing reduction gearbox


Previous: 
Next: 
Product Message
JOIN OUR NEWSLETTER

QUICK LINKS

CONTACT

Fax: +86-750-6310882
Tel: +86-750-6318209 6318263
E-Mail: info@hx-machinery.cn
            vivian@hx-machinery.cn
 
WeChat:+8618825353623
Whatsapp: +8613672844386

Better Touch Better Business

Contact Sales at HONGXIANG.
We are the high end excavator parts suppliers and manufacturer, provides aftermarket excavator parts, mini excavator parts, ect.
Copyright © 2023 HONGXIANG MACHINERY CO. LTD., | All Rights Reserved 丨Sitemap